Designed specifically for the precision pre-lamination of Membrane Electrode Assemblies (MEAs), this equipment enables automatic alignment and high-accuracy bonding between die-cut frames, as well as between frames and Catalyst-Coated Membranes (CCMs). It produces bubble-free, wrinkle-free five-layer pre-assembled MEAs, serving as a critical semi-automated link between upstream coating/ die-cutting processes and downstream hot-press curing.
Lamination accuracy (PEM/CCM vs. frame):peak-to-peak ≤ 0.5 mm
CCD positioning accuracy:± 0.05 mm
Compatible material size range:50 x 50 mm ~ 1200 x 1000 mm
Press roller heating temperature:ambient to 150°C, uniformity ± 3°C
Maximum lamination force:8000 N (adjustable)
Lamination speed:0 – 100 mm/s
Encapsulation yield:≥ 99%
Product changeover time:< 0.5 hour
Designed for the automated roll-to-roll lamination and assembly of frames and CCMs for hydrogen fuel cell membrane electrodes, this system supports the requirements of high-throughput, large-scale production.
Throughput:600 pcs/hour
Lamination operating temperature:≤ 150°C
Compatible product size:500 × 350mm(customizable)
Alignment accuracy:±0.2mm
Tension control accuracy:±2N
Specifically designed for automated lamination, dispensing, curing, and leak testing of hydrogen fuel cell membrane electrodes (MEA) and gas diffusion layers (GDL), providing high-precision, high-consistency packaging solutions for MEA mass production.
Production Capacity:≥5 PPM
Adhesive Compatibility:Hot Melt / Pressure-Sensitive
Dispensing Line Deviation:±0.2mm
GDL-to-Frame Alignment Accuracy:≤ ±0.25mm
Flow Measurement Accuracy:±(0.8% R.D ±0.2% F.S.)
Single-Piece Leak Test Duration:≥40 seconds
National Service Hotline

Sales Email:sales.lhi@leadintelligent.com
After-sales / Complaint Service Email:service_lhi@leadintelligent.com
Contact Address:No. 58, Xinmei Road, Xinwu District, Wuxi City, Jiangsu Province
official account
